Cognoise,
I am seeing some very strange behavior in our Cognos 8.4 environment (which is sourcing Oracle and was updated 2 months ago from 8.1). There have been many instances documented whereupon the format of the date (within a date prompt on a prompt page) changes from one run to the next (just minutes later after having had run the report). The prompt is on a date and should be formatted as such:
09-Dec-2009
But will often come across as:
Dec 9, 2009
With no changes to the source DB or framework manager model. I don't understand how this could happen (or why). These dates are being used within the built-in date prompt tool.
Has anybody seen this or does anyone have any thoughts,
thanks,
Matt